Skip to main content

A Systems View Across Time and Space

Table 2 Full-sample measurement model (reliability indicators)/composites and measures

From: Impact of attitude towards entrepreneurship education and role models on entrepreneurial intention

Items

Loadings

Composite reliability

AVE

Cronbach’s Alpha

Complete

M

F

Complete

M

F

Complete

M

F

Complete

M

F

ATE

0.928

0.913

0.933

0.764

0.724

0.779

0.874

0.872

0.905

 ATE2

0.892

0.833

0.918

         

 ATE3

0.850

0.793

0.882

         

 ATE4

0.859

0.917

0.813

         

 ATE5

0.895

0.854

0.913

         

EI

0.940

0.936

0.933

0.724

0.710

0.703

0.922

0.917

0.912

 EI 1

0.716

0.784

0.613

         

 EI 2

0.871

0.847

0.878

         

 EI 3

0.912

0.895

0.926

         

 EI 4

0.893

0.898

0.873

         

 EI 5

0.810

0.728

0.845

         

 EI 6

0.886

0.889

0.858

         

PSE

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

 PBC

0.895

0.873

0.909

0.588

0.538

0.626

0.859

0.824

0.880

  PBC 1

0.735

0.650

0.792

         

  PBC 2

0.832

0.847

0.805

         

  PBC 3

0.847

0.835

0.841

         

  PBC 4

0.709

0.638

0.784

         

  PBC 5

0.740

0.673

0.775

         

  PBC 6

0.729

0.729

0.747

         

SN

0.914

0.931

0.882

0.780

0.817

0.714

0.859

0.888

0.801

 SN 1

0.866

0.878

0.845

         

 SN 2

0.888

0.924

0.802

         

 SN 3

0.896

0.909

0.886

         

ATEE

0.944

0.935

0.953

0.607

0.568

0.672

0.936

0.926

0.948

 ATEE1

0.838

0.826

0.830

         

 ATEE2

0.824

0.737

0.900

         

 ATEE3

0.863

0.800

0.923

         

 ATEE5

0.799

0.803

0.825

         

 ATEE6

0.833

0.882

0.832

         

 ATEE7

0.715

0.765

0.754

         

 ATEE8

0.763

0.715

0.774

         

 ATEE9

0.674

0.626

0.715

         

 ATEE11

0.680

0.635

0.673

         

 ATEE12

0.787

0.749

0.845

         

 ATEE18

0.772

0.709

0.806

        Â